Sunnex CS2050D (Dual) Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Éclairage Sunnex CS2050D (Dual). Sunnex CS2050D (Dual) User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 32
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
INSTALLATION AND OPERATING MANUAL
INSTALLATION & OPERATING MANUAL
Celestial Star
CS2050M (Mobile) CS2050W (Wall)
CS2050C (Ceiling) CS2050D (Dual)
WWW.SUNNEXMEDICAL.COM
SUNNEX MEDICALIGHT
©
Vue de la page 0
1 2 3 4 5 6 ... 31 32

Résumé du contenu

Page 1 - Celestial Star

INSTALLATION AND OPERATING MANUAL INSTALLATION & OPERATING MANUAL Celestial Star CS2050M (Mobile) CS2050W (Wall) CS2050C (Ceiling)

Page 2 - President, Sunnex, Inc

INSTALLATION AND OPERATING MANUAL 9 Refer to Figures 8, 9 & 10 and Table 1 for mounting heights and appendix A for hole pattern of the transform

Page 3

INSTALLATION AND OPERATING MANUAL 10 6. The contractor assumes the ultimate responsibility for the stability and strength of the final mounted fixt

Page 4

INSTALLATION AND OPERATING MANUAL 11Table 1 Guideline for ceiling style mount (Refers to Figures 8, 9 & 10) CEILING LIGHT MOUNTING INSTRUCTIONS

Page 5

INSTALLATION AND OPERATING MANUAL 12 Figure 8. General mounting (shown with an L-bracket) D GAP 2.25””L-BRACKET NOT INCLUDED

Page 6

INSTALLATION AND OPERATING MANUAL 13 Figure 9. Ceiling light (Standard arm) Figure 10. Ceiling light (Extra-high arm) 5 FEET 1 INCH 6 FEET 1 INC

Page 7

INSTALLATION AND OPERATING MANUAL 145.2 Installation Instructions 1. Slide transformer housing covers off of transformer brackets and set aside fo

Page 8

INSTALLATION AND OPERATING MANUAL 15counter sunk holes on this end of the balance arm. Position the counter weight on the opposite side of the count

Page 9

INSTALLATION AND OPERATING MANUAL 16with each light) can then be used to cover the hole in the drop ceiling created for the extension arms. 3. The

Page 10

INSTALLATION AND OPERATING MANUAL 17 Figure 13 3. Measure and mark on the wall board two vertical lines for three lag bolts, right and left of th

Page 11

INSTALLATION AND OPERATING MANUAL 18 4. Place the wall board in position and secure through the wall to the wooden wall studs, using six lag bolts

Page 12

INSTALLATION AND OPERATING MANUAL 1 Dear Customer: We appreciate that you have chosen to purchase a Sunnex Medical product and believe that it will

Page 13 - INCLUDED

INSTALLATION AND OPERATING MANUAL 19 6. Operating Instructions 1. After successful assembly of your light, plug the Hospital Grade plug into an

Page 14

INSTALLATION AND OPERATING MANUAL 20 CAUTION! DO NOT FORCE MOVEMENT PAST ITS STOP POSITION. Figure 18 Ceiling Light (Ranges of Motion) 7. Mainte

Page 15

INSTALLATION AND OPERATING MANUAL 21 1. A flash cycle at 275 – 279O F (135 – 137O C), for 16 minutes 2. A standard cycle at 275 – 279O F (135 – 13

Page 16

INSTALLATION AND OPERATING MANUAL 22 Figure 19. Bulb Replacement - 1 ROTATE COUNTER-CLOCKWISE Figure 20. Bulb Replacement - 2 Figure 21. Bu

Page 17 - Figure 12

INSTALLATION AND OPERATING MANUAL 23MUST USE A SLOW-BLOW FUSE b. Europe: Sunnex part# 18641 (1.25 AMP, 250V, 5mm X 20mm) MUST USE A SLOW-BLOW FUSE

Page 18 - 64.875” (165cm)

INSTALLATION AND OPERATING MANUAL 24MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, REGARDLESS OF WHETHER SUNNEX KNOWS OR HAS REASON TO KNOW O

Page 19

INSTALLATION AND OPERATING MANUAL 25 (e) Sunnex will ship the repaired Product or a replacement to Customer within ten (10) business days after rece

Page 20

INSTALLATION AND OPERATING MANUAL 269. Troubleshooting PROBLEM POSSIBLE CAUSE SOLUTION No light from light head Light head switch is on OFF posit

Page 21

INSTALLATION AND OPERATING MANUAL 27 10. Appendix Appendix A: TRANSFORMER HOUSING (CEILING, DUAL & WALL) DIMENSIONS MOUNTING

Page 22

INSTALLATION AND OPERATING MANUAL 28 Appendix B: OPTIONAL STEEL STRUCTURE PART# 18750 HORIZONTAL PLATE (OPTIONAL, TO BE PURCHASED SEPARATELY)

Page 23

INSTALLATION AND OPERATING MANUAL 2 CONTENTS 1. Introduction ………………………………………..……………….. 1.1 Contents and Packaging 1.2 About the Light 2. Te

Page 24

INSTALLATION AND OPERATING MANUAL 29 APPENDIX C: DUAL MOUNT SEISMIC BRACKET PART# 18523 SEISMIC BRACKET (COMES STANDARD WITH DUAL LIGHTS ONLY)

Page 25

INSTALLATION AND OPERATING MANUAL 30 PRODUCT SPECIFICATIONS SUBJECT TO CHANGE WITHOUT NOTICE

Page 26

INSTALLATION AND OPERATING MANUAL WWW.SUNNEXMEDICAL.COM Sunnex is certified ISO 9001:2008 by ______________________________________

Page 27

INSTALLATION AND OPERATING MANUAL 3 1. Introduction 1.1 Contents and Packaging Wall Mobile Ceiling Ceiling Dual

Page 28 - DIMENSIONS

INSTALLATION AND OPERATING MANUAL 4 Packaging Checklist CONTENTS CEILING DUAL CEILING WALL MOBILE BALANCE ARM ASSEMBLY 1 2 1 1 CEILING ARM

Page 29 - HORIZONTAL PLATE

INSTALLATION AND OPERATING MANUAL 5• Patented Lamp Shade reduces heat output • Unparalleled Flexibility with Extensive Reach and Range of Motion •

Page 30 - PART# 18523

INSTALLATION AND OPERATING MANUAL 62.3 Main Components and Dimensions Figure 1. Ceiling Figure 2. Wall Figure 3. Mobile (120V Mod

Page 31

INSTALLATION AND OPERATING MANUAL 7 3. Customer Responsibilities Sunnex lights are built to provide exceptional illumination and should impart yo

Page 32

INSTALLATION AND OPERATING MANUAL 8 4. Pre-wiring Instructions 4.1 Standard Receptacle Installations Standard models are designed to be used with

Commentaires sur ces manuels

Pas de commentaire